Homes & property
Understand excavation, groundwater and ground-movement risks. Seek property-condition surveys, monitoring thresholds and a clear response if damage occurs.
Neighbors informing neighbors
A force main for Tysons.
Running through our neighborhoods.
Infrastructure is critical to a developing Tysons Urban Center. Just as critical is the engagement with communities expected to live with it during construction and its operation.
We are asking Fairfax County to hold the first corridor-wide public meeting on Package 4: Force Main in its current form. Residents need accurate information and a meaningful opportunity to have their concerns heard and addressed before the project advances. We also ask the County to pause the project before its next step, including contract award and tree removal.
Show your support.
Sign the residents’ petition →Share information and input through the community survey.
Take the community survey →Is this your neighborhood?
TWCA brings people together to advocate for our homes, trees, schools, and safe access to our neighborhoods. Communities along and near the route include:
About TWCA
The Tysons Wastewater Community Alliance is a resident-led group focused on Fairfax County’s Package 4: Force Main.
We share information, ask questions, and bring people together to help protect homes, neighborhoods, trees, parks, and streams along and near the planned route.
Our Homes. Our Voice.
What unites us
Many neighborhoods. One alliance.
See all our communities ↑Our concern. Our call to the County.
The County’s project website contains outdated and misleading information, and questions about construction and its impacts remain unanswered.
Residents had to find and review the May 2026 CDM Smith design through Ulliman Schutte Construction’s (USC) bid portal to understand the project, its potential impacts and how it differs from what had previously been presented. USC translated the design into construction requirements.
Residents are asking for structural and environmental assessments, and answers about protecting homes, emergency access, trees and parks, and the need for above-ground vents and possible alternatives.
Ask Fairfax County to hold its first corridor-wide public meeting on Package 4: Force Main in its current form. Residents need accurate information and a meaningful opportunity to have their concerns heard and addressed. Ask the County to pause the project before its next step, including contract award and tree removal.
Start here
The Tysons wastewater force main is a pressurized sewer pipeline intended to convey wastewater as Tysons Urban Center grows.
Package 4: Force Main is part of Fairfax County’s Tysons Wastewater Conveyance Systems Modifications. The planned route follows residential streets, passes near schools, and crosses parkland and stream corridors, including land owned by the Town of Vienna. This website brings together information and questions from residents along and near the planned route.
Sources: route length: Fairfax County project page; 30-inch nominal pipe diameter: CDM Smith’s May 2026 GMP plans, sheet C-33, confirmed by bid Addendum No. 5, question 73.
Room to work. The trench needs room for the pipe, the crew installing it and the protective system. One example is steel shoring: panels and braces that support trench walls and help prevent cave-ins. The work area also needs room for machinery, excavated soil and restoration, and to protect and support existing utility lines during excavation or relocate them where needed.
Depth and length. At one location along the planned route, the design profile and bedding detail indicate an estimated excavation depth of approximately 18 feet. Excavation depth varies along the route, and the final depth at this location has not been confirmed. The May 2026 CDM Smith design’s erosion-control notes limit the open trench to 500 linear feet at one time. This is a maximum, not a prediction of the actual open length.
Groundwater and pumping. Where the trench extends below the water table, crews may need specialized pumps to remove water that seeps in or to intercept groundwater before it reaches the trench. Pumping may need to continue overnight or around the clock. Residents are asking whether diesel-powered equipment will be used, how overnight noise would be managed, and how the County will monitor groundwater levels and limit the risk of ground settlement near homes.
What the County still needs to confirm. The County should confirm street-specific excavation depths and widths, open-trench lengths, clear working space inside shoring, and the full work area.
On a residential street near Westbriar Elementary School, a gas main was relocated to make room for the planned force main within a constrained corridor. Some residents learned about the wastewater project only when utility crews arrived. Residents have been told that the work is within the public right-of-way, yet it is close to homes, trees and other infrastructure. They are asking why the force main project’s current design and its potential impacts have not been accurately communicated to them.
Residents report that County staff have cited the public right-of-way as the reason adjoining residents are not considered impacted and that communication or review of plans with them is not required. Residents are asking the County to clarify this position in writing and explain how it accounts for potential effects on nearby homes, trees, schools and residents’ ability to reach their homes.
Much of the planned force main would be constructed within public rights-of-way, close to homes, schools, trees and existing utilities. Residents are asking Fairfax County to explain how the work will affect adjoining properties and what protections will be in place before construction proceeds.
Residents need to know what protections apply when deep excavation takes place in a public right-of-way close to private property. If a home or other property is damaged during or after construction, who is responsible, and what process will residents have to document and resolve a claim?
Earlier County communications indicated that the force main would have no visible above-ground features and that odors were not expected. The project design, however, includes above-ground venting structures with a minimum overall height of 8 feet. County staff have since acknowledged that odors may occur during maintenance and air releases, according to residents.
Residents have requested that the County identify comparable venting structures already in use in Fairfax County, as previously promised. They are also seeking clarification on odor management and how wind and other atmospheric conditions will be considered.
Fairfax County has documented odor concerns involving the Difficult Run wastewater system and sewer-odor complaints near Lake Barcroft and Holmes Run. Fort Belvoir’s master plan reports that Fairfax County began replacing the Dogue Creek force main following premature pipe failure. Residents are asking how lessons from these experiences have informed Package 4’s design, odor controls, monitoring and maintenance, and how the County will respond if problems arise.
Sources: Difficult Run: November 1, 2016 Board package, p. 129; Lake Barcroft Odor Control Project; Fort Belvoir master plan, p. 2-61 (PDF p. 81).
See the route near you
One search checks our 321-address register and shows the address on the map. For other addresses, we look for an official Fairfax County address point.
Green: approximate route. Dashed green: connecting segments. Blue dot: the selected address point, not the pipe.
Approximate route for orientation; consult plans for exact alignment. The Piney Branch / Northside Park (Maud Robinson Wildlife Preserve) corridor follows an approximate reconstruction from coordinate labels on CDM Smith sheets C-14–C-18, rather than a straight connecting line. The Vesper Trail extension is traced approximately from coordinate labels on CDM Smith sheets C-34 and C-35; its endpoint is the Package 4 connection at station 219+93. The approximate end point beside Madison High School is the connection to the Accotink Interceptor through the transition structure shown on sheet C-1 at station 0+04. Address points are not surveyed building corners. A map location or register entry does not establish distance from the pipe, property impacts or whether an address is affected.
Register: 291 core-list addresses and 30 additional park-backing addresses, compiled October 30, 2026 from the May 2026 plans. Register map points use County address data; other results are retrieved from the current County address service.
Follow the route
It’s the streets where we live, the parks we share and the paths we walk.
Putting our goals into practice
Understand excavation, groundwater and ground-movement risks. Seek property-condition surveys, monitoring thresholds and a clear response if damage occurs.
Identify removals and work limits, protect remaining trees and understand how disturbed landscapes and stream crossings will be restored.
Seek traffic management plans that keep residents able to enter and leave their homes, reach schools and leave quickly in an emergency, while allowing fire and emergency vehicles to reach homes without delay throughout construction.
Bring affected communities together to review impacts and alternatives before further commitments. Seek clear, documented commitments.
Common questions
A force main carries wastewater under pressure supplied by pumps. Unlike a gravity sewer, it can move wastewater uphill. Its design must account for pressure, changes in elevation, air management and maintenance.
The 30-inch pipe requires an excavation wider than the pipe itself, with room for installation and trench support. Work also involves equipment, excavated soil, utility coordination, backfilling and surface restoration. It may also require dewatering, or removing groundwater from the excavation. Residents need block-by-block details on trench depth, work areas, traffic changes, and access to homes and streets, including emergency access.
No. Ask for the current plan and profile sheets, the right-of-way and property boundaries, excavation depth, work limits, utility conflicts and the construction sequence for your block. A general route map is not a property-specific impact assessment.
The project design includes above-ground venting structures along the route. Residents are asking where they would be located, how tall they would be, and how they would be maintained, including how potential odors would be managed.
Keep dated copies of plans, written answers, meeting notes and photographs relevant to your questions. Clearly label observations, estimates and confirmed commitments.
Ask the County what pre-construction property assessments, vibration and settlement monitoring, protections, and damage-reporting and claims procedures it will provide.
Residents may wish to document the existing condition of their homes and property with dated photographs and notes before nearby work begins. Consider asking a qualified, independent structural engineer whether a professional pre-construction condition assessment would be useful for your property.
You may also wish to ask your insurer, in writing, what your policy covers or excludes for nearby construction, including vibration, ground movement and groundwater-related damage.
Show your support by signing the residents’ petition, take the survey to share your views, or email Supervisor Alcorn about your concerns and what you want Fairfax County to do before the project advances.
Community resources
Explore community reference materials, project background and information about participating in County decisions.
Open the complete route atlas to view or download.
→COMMUNITY MAP · PDFForce main subdivision boundaries map (3-page PDF)Find County-recorded subdivisions along and near the mapped corridor from Vesper/Higdon to Flint Hill. The numbers follow the route. The boundaries show recorded subdivisions and can differ from civic association boundaries and the area affected by construction.
→COMMUNITY DRIVING GUIDE · PDFDriving tour and park bypasses (5-page PDF)An illustrative driving route with park bypasses, not a construction detour. Includes eight Google Maps driving links.
→DETAILED COMMUNITY REFERENCE · PDFTrees by street and park corridor (97-page PDF)Detailed community register compiled from the May 2026 plans, with separate lists of existing trees marked for removal or preservation and proposed new tree plantings.
→Background on alternatives and earlier planning.
→PUBLIC PARTICIPATIONBoard of Supervisors meetingsMeeting schedules, agendas and opportunities to participate.
→PUBLIC COMMENTClerk to the Board of SupervisorsConfirm speaking arrangements and requirements for submitting materials.
→contact@tysonswastewater.org